We propose a new model formulation for a three-echelon supply network design problem incorporating the concept of relocatable modular capacities. A robust supply network configuration must be determined based on uncertain demand. Furthermore, by incorporating the conditional value at risk...
Persistent link: https://www.econbiz.de/10014237572
We propose a new model formulation for a three-echelon supply network design problem incorporating the concept of relocatable modular capacities. A robust supply network configuration must be determined based on uncertain demand. Furthermore, by incorporating the conditional value at risk...
Persistent link: https://www.econbiz.de/10014325736
Einordnung und Klassifizierung von Problemen der Losgrößenplanung -- Modellformulierungen für mehrstufige Losgrößenprobleme mit Kapazitätsrestriktionen -- Algorithmische Ansätze zur Lösung dynamischer Losgrößenprobleme mit Kapazitätsrestriktionen -- Eine iterative...
Persistent link: https://www.econbiz.de/10014424938
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...