Showing 1 - 10 of 11
Persistent link: https://www.econbiz.de/10012037446
There is an ongoing debate on the introduction of capacity markets in most European countries while a few of them have already established capacity markets. Since the implementation of independent national capacity markets is not in line with the target of a pan-European internal electricity...
Persistent link: https://www.econbiz.de/10011619125
Deterministic capacity planning problems in electricity systems can be solved by comparing technology specific long-term and short-term marginal costs. In an uncertain market environment, Mean-Variance Portfolio (MVP) theory provides a consistent framework to balance risk and return in power...
Persistent link: https://www.econbiz.de/10011039630
Power systems with high shares of wind and solar power have to balance their intermittent nature. Pumped-hydro storage plants can provide the required flexibility, while thermal backup plants offer an alternative. This paper proposes a capacity planning model to describe the efficient technology...
Persistent link: https://www.econbiz.de/10010616834
Persistent link: https://www.econbiz.de/10003920709
Integrating large quantities of supply-driven renewable electricity generation remains a political and operational challenge. One of the main obstacles in Europe to installing at least 200 GWs of power from variable renewable sources is how to deal with the insufficient network capacity and the...
Persistent link: https://www.econbiz.de/10009579625
Persistent link: https://www.econbiz.de/10009687965
Persistent link: https://www.econbiz.de/10009724644
The modelling of energy systems often has to balance two aspects. High level of detail, e.g. technical constraints on the one hand and analysis of long-term system optimization on the other. When focusing on one of the two aspects, models can be solved in a reasonable time. In order to combine...
Persistent link: https://www.econbiz.de/10012893503
Investment decisions in competitive power markets are based upon thorough profitability assessments. Thereby, investors typically show a high degree of risk aversion, which is the main argument for capacity mechanisms being implemented around the world. In order to investigate the...
Persistent link: https://www.econbiz.de/10012672003