Showing 1 - 10 of 2,491
Considering a temporal dimension allows for the delivery of rolling solutions to complex real-world problems. Moving forward in time brings uncertainty, and large margins for potential error in solutions. For the multi-year crop planning problem, the largest uncertainty is how the climate will...
Persistent link: https://www.econbiz.de/10012880126
Persistent link: https://www.econbiz.de/10014228053
Persistent link: https://www.econbiz.de/10012523162
Persistent link: https://www.econbiz.de/10014444153
Persistent link: https://www.econbiz.de/10011737222
considered and the level of risk aversion of the decision maker. With respect to the technology competitiveness, photovoltaic is … uncertainty. Although wind technology is currently more competitive than wave, except for high-risk averse decision …
Persistent link: https://www.econbiz.de/10013550073
The catastrophic events are characterized by "low frequency and high severity". Nevertheless, during the last decades, both the frequency and the magnitude of these events have been significantly rising worldwide. In 2021, the European Commission adopted a new Strategy on Adaptation to Climate...
Persistent link: https://www.econbiz.de/10012609390
This documented case of climate change adaptation in Campeche Mexico grapples with a problem that is fundamental to addressing climate change risks in areas of high vulnerability, which is how to reach consensus and take decisions under an uncertain future. The state of Campeche in Mexico, is...
Persistent link: https://www.econbiz.de/10012560506
Persistent link: https://www.econbiz.de/10011628462
Persistent link: https://www.econbiz.de/10011793535