Showing 1 - 4 of 4
Persistent link: https://www.econbiz.de/10011639678
Persistent link: https://www.econbiz.de/10011900441
This paper considers the uncapacitated lot sizing problem with batch delivery, focusing on the general case of time-dependent batch sizes. We study the complexity of the problem, depending on the other cost parameters, namely the setup cost, the fixed cost per batch, the unit procurement cost...
Persistent link: https://www.econbiz.de/10010666116
This paper introduces new environmental constraints, namely carbon emission constraints, in multi-sourcing lot-sizing problems. These constraints aim at limiting the carbon emission per unit of product supplied with different modes. A mode corresponds to the combination of a production facility...
Persistent link: https://www.econbiz.de/10010608506