Showing 1 - 10 of 15
Numerous exact algorithms have been developed for solving the resource-constrained project scheduling problem. Experimental studies have shown that currently even projects with only 60 activities cannot be optimally solved within a reasonable amount of time. Therefore heuristics employing...
Persistent link: https://www.econbiz.de/10011558746
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011558747
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011558763
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011613753
Persistent link: https://www.econbiz.de/10011787442
Persistent link: https://www.econbiz.de/10011787456
Persistent link: https://www.econbiz.de/10011787477
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239
Persistent link: https://www.econbiz.de/10011806934
Persistent link: https://www.econbiz.de/10011806935