Showing 1 - 5 of 5
Persistent link: https://www.econbiz.de/10010370263
Persistent link: https://www.econbiz.de/10012495304
Persistent link: https://www.econbiz.de/10011987540
Persistent link: https://www.econbiz.de/10014532311
This paper addresses the joint quay crane and truck scheduling problem at a container terminal, considering the coordination of the two types of equipment to reduce their idle time between performing two successive tasks. For the unidirectional flow problem with only inbound containers, in which...
Persistent link: https://www.econbiz.de/10011097719