Showing 1 - 10 of 62
Persistent link: https://www.econbiz.de/10011488199
Persistent link: https://www.econbiz.de/10011449121
Persistent link: https://www.econbiz.de/10011445242
Persistent link: https://www.econbiz.de/10009784065
Persistent link: https://www.econbiz.de/10011655206
The railway crew scheduling problem consists of generating crew duties to operate trains at minimal cost, while meeting all work regulations and operational requirements. Typically, a railway operation uses tens of thousands of train movements (trips) and requires thousands of crew members to be...
Persistent link: https://www.econbiz.de/10011052662
Persistent link: https://www.econbiz.de/10012132512
In the Home Care Crew Scheduling Problem a staff of home carers has to be assigned a number of visits to patients’ homes, such that the overall service level is maximised. The problem is a generalisation of the vehicle routing problem with time windows. Required travel time between visits and...
Persistent link: https://www.econbiz.de/10010871199
Persistent link: https://www.econbiz.de/10011473054
Persistent link: https://www.econbiz.de/10012132488