Hoogeveen, J. (Han) A.; Sethi, Suresh; Sriskandarajah, … - 2014
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...