Showing 1 - 10 of 38
times associated with building new capacity, the lack of price response in the face of time-varying costs, the large …
Persistent link: https://www.econbiz.de/10009435559
produce power on the customer side of the meter, is small but growing steadily. The installed capacity of domestic small wind …, and the dollar per Watt amount will vary based on the total rated turbine capacity. …
Persistent link: https://www.econbiz.de/10009435571
future. The future in the Carbon Cap Scenario has higher electricity prices, reduced driving, more renewable capacity, and …
Persistent link: https://www.econbiz.de/10009435766
make a significant contribution towards meeting the planned addition of generation capacity by the year 2000. …
Persistent link: https://www.econbiz.de/10009435825
degrading way, (2) eliminates the need to build significant amounts of new fossil-fueled, electric generating capacity, saving …
Persistent link: https://www.econbiz.de/10009435877
--i.e., whether a utility should sign a power purchase agreement (PPA) with a NUG, or develop and own the generation capacity itself … article looks at a publicly owned utility's decision to buy or build new renewable energy capacity--specifically wind and … assess the levelized cost of electricity under four supply options: (1) public utility ownership of new geothermal capacity …
Persistent link: https://www.econbiz.de/10009435943
generation, and monthly maximum generating capability--capacity--for OY 2000-01, 2004-05, and 2009-10. The Federal system and …--are subtracted from the projected capability of existing and ''contracted for'' resources to determine whether BPA and the region … surplus of energy and/or capacity, which BPA may use or market to increase revenues. Conversely, if Federal system firm loads …
Persistent link: https://www.econbiz.de/10009436021
retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a …-power requirements from the current Pacific Northwest Coordination Agreement (PNCA). Additional resource capability estimates were … monthly peak demand, monthly energy demand, monthly 1-hour peak generating capability, and monthly energy generation for OY …
Persistent link: https://www.econbiz.de/10009436022
energy capacity additions. The focus of most RPS activity in the U.S. has been within the states. Nonetheless, the U.S. House …
Persistent link: https://www.econbiz.de/10009436034
generating capacity added in the U.S. between 1999 and 2005 (EIA 2006b), bringing the nationwide market share of gas …
Persistent link: https://www.econbiz.de/10009436086