The Work Breakdown Structure (WBS) technique is primarily a project management planning technique which is aimed at defining, within an overall conceptual framework, the detailed products and work effort to be accomplished for successful achievement of the project objective(s). The WBS technique...
Persistent link: https://www.econbiz.de/10009435673
This is the users guide for the Geothermal Loan Guaranty Cash Flow Model (GCFM). GCFM is a Fortran code which designs and costs geothermal fields and electric power plants. It contains a financial analysis module which performs life cycle costing analysis taking into account various types of...
Persistent link: https://www.econbiz.de/10009436495