Showing 1 - 10 of 35,271
long-run impact on the productive capacity of the economy through hysteresis effects. These demand shocks are found to be …
Persistent link: https://www.econbiz.de/10012417528
We construct new estimates of potential output and the output gap using a multivariate approach that allows for an explicit role for measurement errors in the decomposition of real output. Because we include data on hours, output, employment, and the labor force, we are able to decompose our...
Persistent link: https://www.econbiz.de/10013118624
A path forecast refers to the sequence of forecasts 1 to H periods into the future. A summary of the range of possible paths the predicted variable may follow for a given confidence level requires construction of simultaneous confidence regions that adjust for any covariance between the elements...
Persistent link: https://www.econbiz.de/10003805619
A path forecast refers to the sequence of forecasts 1 to H periods into the future. A summary of the range of possible paths the predicted variable may follow for a given confidence level requires construction of simultaneous confidence regions that adjust for any covariance between the elements...
Persistent link: https://www.econbiz.de/10014216513
Economists often seek to estimate unobserved variables, representing “equilibrium” or “expected” values of economic variables, as benchmarks against which observed, realised values of these variables may be evaluated. Such comparisons are often used as economic policy indicators, for...
Persistent link: https://www.econbiz.de/10012445291
structural break, nonlinearity, asymmetry, and cross-sectional correlation within panel-data estimation including the use of a …
Persistent link: https://www.econbiz.de/10012257115
This study demonstrates that nonlinearities, coupled with worker heterogeneity, make it possible to reconcile the Diamond-Mortensen-Pissarides model with the labor market dynamics observed in the United States. Nonlinearities, induced by firings and downward real wage rigidities, magnify...
Persistent link: https://www.econbiz.de/10012697332
The topic of this paper is the estimation uncertainty of the Stock-Watsonand Gonzalo-Granger permanent …
Persistent link: https://www.econbiz.de/10009530402
The topic of this paper is the estimation uncertainty of the Stock-Watson and Gonzalo-Granger permanent …
Persistent link: https://www.econbiz.de/10010489880
This paper investigates how the ordering of variables affects properties of the time-varying covariance matrix in the Cholesky multivariate stochastic volatility model. It establishes that systematically different dynamic restrictions are imposed when the ratio of volatilities is time-varying....
Persistent link: https://www.econbiz.de/10012826753