Showing 1 - 6 of 6
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is...
Persistent link: https://www.econbiz.de/10009758826
This paper presents a multi-objective mixed-integer nonlinear programming model to design a group layout of a cellular manufacturing system in a dynamic environment, in which the number of cells to be formed is variable. Cell formation (CF) and group layout (GL) are concurrently made in a...
Persistent link: https://www.econbiz.de/10009759157
Persistent link: https://www.econbiz.de/10010202868
Persistent link: https://www.econbiz.de/10010493049
Persistent link: https://www.econbiz.de/10014265686
Persistent link: https://www.econbiz.de/10015052552