Showing 1 - 7 of 7
This paper considers a problem of optimal preventive maintenance and replacement schedule of equipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most one replacement of the existing machinery by a new one is allowed. The problem...
Persistent link: https://www.econbiz.de/10014218378
Persistent link: https://www.econbiz.de/10013205997
Persistent link: https://www.econbiz.de/10012697559
Persistent link: https://www.econbiz.de/10012306661
Persistent link: https://www.econbiz.de/10011794458
Persistent link: https://www.econbiz.de/10014562817
Persistent link: https://www.econbiz.de/10014283020