Showing 1 - 8 of 8
Persistent link: https://www.econbiz.de/10002856210
Many production systems cannot produce to stock and utilize capacity management to cope with variability in demand, for example Make-to-order (MTO) systems. Often, regular capacity can be increased through a flexible workforce, but the decision about the additional capacity must be made before...
Persistent link: https://www.econbiz.de/10013217574
Persistent link: https://www.econbiz.de/10011350532
Persistent link: https://www.econbiz.de/10003959286
Persistent link: https://www.econbiz.de/10003844541
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011942632