Showing 1 - 3 of 3
Persistent link: https://www.econbiz.de/10010493355
In this paper, we tackle the problem of scheduling multisite and multimode activities in order to minimise the project duration that meets the constraints imposed by limited resources. The industrial system is composed of many production sites, and each site has its own resources called local...
Persistent link: https://www.econbiz.de/10005754467
In this paper, we tackle the problem of scheduling multisite and multimode activities in order to minimise the project duration that meets the constraints imposed by limited resources. The industrial system is composed of many production sites, and each site has its own resources called local...
Persistent link: https://www.econbiz.de/10008563661