Showing 1 - 10 of 12
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011558736
Persistent link: https://www.econbiz.de/10000984569
Persistent link: https://www.econbiz.de/10011497701
Persistent link: https://www.econbiz.de/10001498214
Persistent link: https://www.econbiz.de/10002243235
Persistent link: https://www.econbiz.de/10003182783
Persistent link: https://www.econbiz.de/10003522527
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011737361
Persistent link: https://www.econbiz.de/10013520521
Persistent link: https://www.econbiz.de/10013520770