Showing 1 - 1 of 1
In a recent study [Chiu et al., 2007. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research 180, 664–676], the perfect rework of nonconforming items was assumed in a production system that is subject to stochastic...
Persistent link: https://www.econbiz.de/10010744028