The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of...
Persistent link: https://www.econbiz.de/10011773036
The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of...