Showing 1 - 10 of 23
Persistent link: https://www.econbiz.de/10002051921
This paper is concerned with explicit optimal control for a deterministic manufacturing system consisting of a single reliable machine and producing two part types studied by Connolly (Master Thesis, Operations Research Center, MIT, Cmbridge, 1992) and Gershwin (Manufacturing Systems...
Persistent link: https://www.econbiz.de/10012906226
This paper presents an asymptotic analysis of a stochastic manufacturing system consisting of parallel machines subject to breakdown and repair and facing a constant demand, as the rates of change of the machine states approach infinity. This situation gives rise to a limiting problem in which...
Persistent link: https://www.econbiz.de/10012720681
This paper presents an extension of earlier research on hierarchical control of stochastic manufacturing systems with long-run average cost in which a positive inventory deterioration/cancellation rate for each product is assumed. Here we drop the assumption of the positive inventory...
Persistent link: https://www.econbiz.de/10014218628
Recently, the production control problem in stochastic manufacturing systems has generated a great deal of interest. The goal is to obtain production rates to minimize total expected surplus and production cost. This paper reviews the research devoted to minimum average cost production planning...
Persistent link: https://www.econbiz.de/10014047598
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835293
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835668
An asymptotic analysis of a hierarchical manufacturing system with machines subject to breakdown and repair is presented. The machine fluctuations are much faster than the accumulation and discounting of costs, and this gives rise to a limiting problem in which the stochastic machine...
Persistent link: https://www.econbiz.de/10012834712
This paper presents an asymptotic analysis of hierarchical investment and production decisions in a manufacturing system with machines subject to breakdown and repair. The demand facing the system is assumed to be a given constant. The production capacity can be increased by purchasing a new...
Persistent link: https://www.econbiz.de/10012835071
We consider a problem of controlling the production rate of a single machine, single product, stochastic manufacturing system in order to minimize the total discounted inventory /backlog costs. The demand has two components: one is deterministic with constant rate d and the other is stochastic...
Persistent link: https://www.econbiz.de/10012835286