Showing 1 - 10 of 92
In this paper we present a polynomial time dynamic programming algorithm for solving a scheduling problem with a (total) weighted completion time objective function where the weights are activity- and time-dependent. We highlight application areas for this type of problem to underscore the...
Persistent link: https://www.econbiz.de/10011558733
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011558736
The resource investment problem deals with the issue of providing resources to a project such that a given deadline can be met. The objective is to make the resources available in the cheapest possible way. For each resource, expenses depend on the maximum amount required during the course of...
Persistent link: https://www.econbiz.de/10011558737
Gegenstand der vorliegenden Arbeit sind zwei praktisch und theoretisch bedeutsame Probleme, die bei just-in-time orientierter Variantenfließfertigung auftreten. Ein Problem besteht darin, den Teilebedarf in der Endmontage so konstant wie möglich zu halten ("Level Scheduling Problem"). Das...
Persistent link: https://www.econbiz.de/10011558743
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011558745
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011558760
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011558763
A flow line consists of a sequence of work places (or stations) through which one or more producta (or models) move one-way in order to be processed. Each model requires specific Operations which must be performed in a predefined Order. To be able to do so, the stations must be equipped with...
Persistent link: https://www.econbiz.de/10011583028
While balancing straight assembly lines is a well-studied problem, the Situation where the assembly line has a U-shaped Iayout is a still emerging research field. The advantage of these lines is that workers may simply turn around to operate at two legs of the line. Hence, there is an additional...
Persistent link: https://www.econbiz.de/10011583034