Showing 1 - 10 of 17,738
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010414317
Persistent link: https://www.econbiz.de/10011492058
Persistent link: https://www.econbiz.de/10011588379
Persistent link: https://www.econbiz.de/10012820154
Persistent link: https://www.econbiz.de/10011350469
Persistent link: https://www.econbiz.de/10014437569
Persistent link: https://www.econbiz.de/10012146024
This paper considers the production planning problem of a firm that produces a single product using a process that has multiple production lines (or machines) in parallel, each with a finite production capacity. Specifically, the firm has m parallel production lines, each with capacity of P...
Persistent link: https://www.econbiz.de/10012838802
Persistent link: https://www.econbiz.de/10012609221
Persistent link: https://www.econbiz.de/10014265791