Showing 1 - 10 of 16,967
performance of PPP. The book applies mathematical models to analyze PPP. It uses game theory to study the interaction and dynamics … game theory-based simulation how governments can adopt a screening process at the start of each procurement to weed out … anyone interested in public policymaking and public infrastructure management." …
Persistent link: https://www.econbiz.de/10012543104
Persistent link: https://www.econbiz.de/10013176476
Persistent link: https://www.econbiz.de/10011564577
Persistent link: https://www.econbiz.de/10001378289
Persistent link: https://www.econbiz.de/10013264811
Persistent link: https://www.econbiz.de/10011598405
We propose a method to estimate both whether there is an overall infrastructure shortage and the optimal share of … infrastructure in gross fixed capital formation (GFCF). This is based on a two-gap model and linear programming, and is illustrated … infrastructures in GFCF. Then, there would have been an infrastructure shortage up until 1964, and an infrastructure surplus there …
Persistent link: https://www.econbiz.de/10014181595
Persistent link: https://www.econbiz.de/10014283050
Persistent link: https://www.econbiz.de/10008702094
Persistent link: https://www.econbiz.de/10010371421