Showing 1 - 10 of 12
Persistent link: https://www.econbiz.de/10001186232
Persistent link: https://www.econbiz.de/10008934444
Persistent link: https://www.econbiz.de/10001692168
Persistent link: https://www.econbiz.de/10003733557
Persistent link: https://www.econbiz.de/10003670699
This paper considers a production-inventory problem in which the manufacturer participates in an energy buy-back program, which offers him probabilistic opportunities with rewards for not using electricity. That is, the manufacturer will get paid for stopping production to save on electricity....
Persistent link: https://www.econbiz.de/10014046878
We consider two specially structured assemble-to-order (ATO) systems -- the N- and W-systems -- under continuous review, stochastic demand, and non-identical component replenishment leadtimes. Using a hybrid approach that combines sample-path analysis, linear programming, and the tower property...
Persistent link: https://www.econbiz.de/10013005813
This paper is concerned with explicit optimal control for a deterministic manufacturing system consisting of a single reliable machine and producing two part types studied by Connolly (Master Thesis, Operations Research Center, MIT, Cmbridge, 1992) and Gershwin (Manufacturing Systems...
Persistent link: https://www.econbiz.de/10012906226
Persistent link: https://www.econbiz.de/10013374977
Persistent link: https://www.econbiz.de/10003917739