Showing 1 - 6 of 6
Persistent link: https://www.econbiz.de/10010361408
Persistent link: https://www.econbiz.de/10011639212
Persistent link: https://www.econbiz.de/10011707112
Persistent link: https://www.econbiz.de/10014558788
Persistent link: https://www.econbiz.de/10014283009
In this paper, an overview is presented of the existing metaheuristic solution procedures to solve the multi-mode resource-constrained-project scheduling problem, in which multiple execution modes are available for each of the activities of the project. A fair comparison is made between the...
Persistent link: https://www.econbiz.de/10010871299