Showing 1 - 10 of 18
The Interim Standard Offer Number Four Contracts (ISM), under which most of the geothermal industry is selling power (outside of The Geysers), has an initial ten year period of known fixed energy payments. In the eleventh year, the price goes to the Avoided Cost of the buying utility. The...
Persistent link: https://www.econbiz.de/10009435409
The city of Susanville, in response to an unemployment rate exceeding 20 percent and other related community needs, has embarked on a comprehensive effort in community and economic development. To improve the local job market, an effort is underway to enhance the competitive position of the...
Persistent link: https://www.econbiz.de/10009435442
In order to develop an initial estimate of the potential competitiveness of low temperature (45 degrees C to 100 degrees C) geothermal resources on the Eastern Coastal Plain, the Center for Metropolitant Planning and Research of The Johns Hopkins University reviewed and compared available energy...
Persistent link: https://www.econbiz.de/10009435445
Oregon's geothermal resources represent a large portion of the nation's total geothermal potential. The State's resources are substantial in size, widespread in location, and presently in various stages of discovery and utilization. The exploration for, and development of, geothermal is...
Persistent link: https://www.econbiz.de/10009436730
This study is designed to assist the Division of Geothermal Energy (DGE) in deciding what kind of strategy it wants and needs in order to make its international effort as cost-effective and appropriate as possible. The purpose of this study is to construct a logic base on which DGE can, in turn,...
Persistent link: https://www.econbiz.de/10009437373
A preliminary resource assessment, based on the best available parameters, was made to identify potentially suitable fairways. Of those examined only the Brazoria Fairway in the Frio Formation was able to produce sufficient fluid to meet the minimum requirements. These requirements are based...
Persistent link: https://www.econbiz.de/10009435603
This study provides local economic impact estimates for a 100 megawatt (MW) geothermal power project in Oregon. The hypothetical project would be Deschutes County. Bonneville Power Administration commissioned this study to quantify such impacts as part of regional confirmation work recommended...
Persistent link: https://www.econbiz.de/10009435651
This study provides local economic impact estimates for a 100 megawatt (MW) geothermal power project in Oregon. The hypothetical project would be in Harney Count. Bonneville Power Administration commissioned this study to quantify such impacts as part of regional confirmation work recommended by...
Persistent link: https://www.econbiz.de/10009435836
The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands...
Persistent link: https://www.econbiz.de/10009436029
Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important...
Persistent link: https://www.econbiz.de/10009436093