Showing 1 - 10 of 13
Persistent link: https://www.econbiz.de/10000954911
Persistent link: https://www.econbiz.de/10000714716
Persistent link: https://www.econbiz.de/10000150811
Persistent link: https://www.econbiz.de/10000896713
The "Capacitated lot sizing problem with setup carry-over" is based ort the well known "Capacitated lot sizing problem" and incorporates the possibility of preserving a setup-state from a period to the following. Sox and Gao [2] decompose their formulation of the first one (GCLP1) by Lagrangian...
Persistent link: https://www.econbiz.de/10011725279
This paper addresses a general class of nonpreemptive resource-constrained project scheduling problems in which activity durations are discrete functions of committed renewable and nonrenewabe resources. We provide a 0-1 problem formulation and stress the importance of the outlined model by...
Persistent link: https://www.econbiz.de/10011743260
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.
Persistent link: https://www.econbiz.de/10011808833
Persistent link: https://www.econbiz.de/10002387215
We present a stochastic version of the single-level, multi-product dynamic lotsizing problem subject to a capacity constraint. A production schedule has to be determined for random demand so that expected costs are minimized and a constraint based on a new backlog-oriented -service-level measure...
Persistent link: https://www.econbiz.de/10008909556
Persistent link: https://www.econbiz.de/10011735513