Showing 1 - 10 of 351
Persistent link: https://www.econbiz.de/10010210832
Persistent link: https://www.econbiz.de/10009732681
Persistent link: https://www.econbiz.de/10012315533
Persistent link: https://www.econbiz.de/10013445647
Persistent link: https://www.econbiz.de/10011603978
Persistent link: https://www.econbiz.de/10011875002
Persistent link: https://www.econbiz.de/10010386721
Persistent link: https://www.econbiz.de/10011656013
Persistent link: https://www.econbiz.de/10011575595
The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi …: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in … decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order …
Persistent link: https://www.econbiz.de/10011565241