Showing 1 - 3 of 3
Persistent link: https://www.econbiz.de/10011695342
The integrated production and transportation scheduling problem (PTSP) with capacity constraints is common in many industries. An optimal solution to PTSP requires one to simultaneously solve the production scheduling and the transportation routing problems, which requires excessive...
Persistent link: https://www.econbiz.de/10014036428
We study a supply planning problem in a manufacturing system with two stages. The first stage is a remanufacturer that supplies two closely-related components to the second (manufacturing) stage, which uses each component as the basis for its respective product. The used products are recovered...
Persistent link: https://www.econbiz.de/10013055162