Showing 1 - 10 of 44
Persistent link: https://www.econbiz.de/10000621529
Since its advent, the 'just-in-time'-paradigm has considerable influence on production planning and control. While originally employed for high-volume production, 'just-in-time'-concepts are meanwhile documented for low-volume, make-to-order production as well. An example is the assembly of...
Persistent link: https://www.econbiz.de/10011736864
Persistent link: https://www.econbiz.de/10001737244
Persistent link: https://www.econbiz.de/10001230953
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011739559
Persistent link: https://www.econbiz.de/10011735568
Persistent link: https://www.econbiz.de/10000682119
Persistent link: https://www.econbiz.de/10003719310
Persistent link: https://www.econbiz.de/10008859906
Persistent link: https://www.econbiz.de/10003982895