Showing 1 - 9 of 9
Persistent link: https://www.econbiz.de/10001810370
Persistent link: https://www.econbiz.de/10002397280
Persistent link: https://www.econbiz.de/10001735561
Persistent link: https://www.econbiz.de/10002400727
Persistent link: https://www.econbiz.de/10002400815
Persistent link: https://www.econbiz.de/10003587892
Persistent link: https://www.econbiz.de/10003089699
Persistent link: https://www.econbiz.de/10011991111
Recently, time-switch constraints have been introduced in literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated into...
Persistent link: https://www.econbiz.de/10014105801