We consider project scheduling problems subject to general temporal constraints, where the utilization of a set of renewable resources has to be smoothed over a prescribed planning horizon. In particular, we consider the classical resource leveling problem, where the variation in resource...
Persistent link: https://www.econbiz.de/10011052589
Persistent link: https://www.econbiz.de/10012419318
Persistent link: https://www.econbiz.de/10011811792
Persistent link: https://www.econbiz.de/10014265740
The concept of partially renewable resources provides a general modeling framework that can be used for a wide range of different real-life applications. In this paper, we consider a resource-constrained project duration problem with partially renewable resources, where the temporal constraints...
Persistent link: https://www.econbiz.de/10014497492
In this paper, we consider the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. For the first time, the concept of partially renewable resources is embedded in the context of projects with general temporal constraints. While...
Persistent link: https://www.econbiz.de/10014503793
We study the scheduling of projects subject to general temporal constraints between activities such that the project net present value is maximized. The proposed algorithm is based on a first-order steepest ascent approach, where the steepest ascent directions are normalized by the supremum...
Persistent link: https://www.econbiz.de/10010847874
We study the scheduling of projects subject to general temporal constraints between activities such that the project net present value is maximized. The proposed algorithm is based on a first-order steepest ascent approach, where the steepest ascent directions are normalized by the supremum...