Showing 1 - 10 of 979
Persistent link: https://www.econbiz.de/10011290647
Persistent link: https://www.econbiz.de/10011290719
Persistent link: https://www.econbiz.de/10003983020
Persistent link: https://www.econbiz.de/10009270890
Persistent link: https://www.econbiz.de/10003908681
Persistent link: https://www.econbiz.de/10003380371
Persistent link: https://www.econbiz.de/10003659484
The Critical Chain Scheduling and Buffer Management (CC/BM) methodology, proposed by Goldratt (1997), introduced the concepts of feeding buffers, project buffers and resource buffers as well as the roadrunner mentality. This last concept, in which activities are started as soon as possible, was...
Persistent link: https://www.econbiz.de/10014198085
The resource-constrained project scheduling problem (RCPSP) has been widely studied. A fundamental assumption of the basic type of RCPSP is that activity durations are deterministic (i.e., they are known in advance). In reality, however, this is almost never the case.In this article we...
Persistent link: https://www.econbiz.de/10013026455
Persistent link: https://www.econbiz.de/10011289786