We consider a project scheduling problem where the precedence constraints graph is an out-tree. The processing times can be compressed by using additional resources, which causes cost and simultaneously reduces the processing times of jobs. The objective is to minimize the sum of total lateness...
Persistent link: https://www.econbiz.de/10011558722
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011558760
Persistent link: https://www.econbiz.de/10000050861
Persistent link: https://www.econbiz.de/10000089926
Persistent link: https://www.econbiz.de/10000812641
Persistent link: https://www.econbiz.de/10000373003
Persistent link: https://www.econbiz.de/10001246785
Persistent link: https://www.econbiz.de/10001057271
Persistent link: https://www.econbiz.de/10012152301