Showing 1 - 10 of 17,476
Persistent link: https://www.econbiz.de/10011899740
In the traditional location-inventory system, every demand depot could be served by only one distribution center (DC). This paper relaxes the assumption. The demand depot could be split and served by more than one DC. First, based on the capacitated location-inventory model, the...
Persistent link: https://www.econbiz.de/10012622041
Persistent link: https://www.econbiz.de/10011705123
Persistent link: https://www.econbiz.de/10003617153
Persistent link: https://www.econbiz.de/10010386415
Persistent link: https://www.econbiz.de/10012240237
Persistent link: https://www.econbiz.de/10012193247
Persistent link: https://www.econbiz.de/10012314368
Persistent link: https://www.econbiz.de/10003617141
This paper describes new heuristic reactive project scheduling procedures that may be used to repair resource-constrained roject baseline schedules that suer from multiple activity duration disruptions during project execution.The objective is to minimize the deviations between the baseline...
Persistent link: https://www.econbiz.de/10014057657