Showing 1 - 10 of 19,364
Persistent link: https://www.econbiz.de/10012200317
Persistent link: https://www.econbiz.de/10001166379
Optimal age replacement policies for network components such as cables, overhead lines or transformers are usually identified based on gathered knowledge about the state of a component and its stochastic deterioration process. In this context, uncertainty is an important challenge because...
Persistent link: https://www.econbiz.de/10010433658
Persistent link: https://www.econbiz.de/10001218094
We develop a novel, workable switching option model approach to component redesign and replacement projects that are divisible into sequential phases. The component manufacturer has the option to retain the current product position and abandon the project, or switch to a redesigned product...
Persistent link: https://www.econbiz.de/10013241796
Persistent link: https://www.econbiz.de/10012195760
Persistent link: https://www.econbiz.de/10003987658
Persistent link: https://www.econbiz.de/10009625312
Persistent link: https://www.econbiz.de/10010531885
Persistent link: https://www.econbiz.de/10009789408