Showing 1 - 10 of 17,368
Persistent link: https://www.econbiz.de/10012663702
Persistent link: https://www.econbiz.de/10012225038
Persistent link: https://www.econbiz.de/10013449449
This study was conducted to investigate the problem of robust integrated project scheduling and material ordering in terms of resource constraints, uncertainty, and lag times. Simultaneous consideration of discount, non-renewability, perishability, uncertainty, and different project...
Persistent link: https://www.econbiz.de/10014261491
Persistent link: https://www.econbiz.de/10013530889
Persistent link: https://www.econbiz.de/10010500805
To complete a successful energy project, all aspects and criteria which can influence the project should be considered. Classic time-cost trade-off (TCT) is used when the completion time of project is not acceptable for customers or top managers. This paper proposes a new...
Persistent link: https://www.econbiz.de/10014548338
Persistent link: https://www.econbiz.de/10012316111
Persistent link: https://www.econbiz.de/10011417450
Persistent link: https://www.econbiz.de/10011475721