Showing 1 - 10 of 11,949
Persistent link: https://www.econbiz.de/10009562182
Persistent link: https://www.econbiz.de/10009766191
Persistent link: https://www.econbiz.de/10011290732
To complete a successful energy project, all aspects and criteria which can influence the project should be considered. Classic time-cost trade-off (TCT) is used when the completion time of project is not acceptable for customers or top managers. This paper proposes a new...
Persistent link: https://www.econbiz.de/10014548338
Persistent link: https://www.econbiz.de/10012183635
Persistent link: https://www.econbiz.de/10011312315
Persistent link: https://www.econbiz.de/10011664847
Persistent link: https://www.econbiz.de/10013499183
In a conventional dial-a-ride-system passengers are moved with the same vehicle between their pickup and their drop-off location. In a dial-a-ride-system with transfer, it is possible (or even standard) that passengers change the vehicle once or several times. Transfer Scheduling Constraints...
Persistent link: https://www.econbiz.de/10011300632
Persistent link: https://www.econbiz.de/10011342998