Showing 1 - 9 of 9
Persistent link: https://www.econbiz.de/10011695342
A great deal of work has been done to analyze the problem of robot move sequencing and part scheduling in robotic flowshop cells. We examine the recent developments in this literature. A robotic flowshop cell consists of a number of processing stages served by one or more robots. Each stage has...
Persistent link: https://www.econbiz.de/10014218350
We consider the problem of scheduling operations in bufferless robotic cells that produce identical parts. Maximizing the long-term average throughput of parts is an important problem in both theory and practice. We define an appropriate state space required to analyze this problem and show that...
Persistent link: https://www.econbiz.de/10014047846
This article assesses the benefits of implementing a dual-arm robot in a flow shop manufacturing cell. Such a robot has the ability to tend (unload or load) to two adjacent machines simultaneously. This significantly changes the analysis required to find sequences of robot actions that maximize...
Persistent link: https://www.econbiz.de/10014146300
We study conflict and cooperation issues arising in a supply chain where a manufacturer makes products which are shipped to customers by a distributor. The manufacturer and the distributor each has an ideal schedule, determined by cost and capacity considerations. However, these two schedules...
Persistent link: https://www.econbiz.de/10014036422
The integrated production and transportation scheduling problem (PTSP) with capacity constraints is common in many industries. An optimal solution to PTSP requires one to simultaneously solve the production scheduling and the transportation routing problems, which requires excessive...
Persistent link: https://www.econbiz.de/10014036428
Constant travel-time robotic cells with a single gripper robot and with one or more machines at each processing stage have been studied in the literature. By contrast, cells with a dual gripper robot, although more productive, have so far received scant attention, perhaps due to their inherent...
Persistent link: https://www.econbiz.de/10014036430
We investigate the integrated production and distribution scheduling problem in a supply chain. The manufacturer’s production environment is modeled as a parallel machine system. A single capacitated vehicle is employed to deliver products in batches to multiple customers. The scheduling...
Persistent link: https://www.econbiz.de/10014036446
This article considers the problems of scheduling operations in single-gripper and dual-gripper bufferless robotic cells in which the arrangement of machines is circular. The cells are designed to produce identical parts under the free-pickup criterion with additive intermachine travel time. The...
Persistent link: https://www.econbiz.de/10014036447