Showing 1 - 10 of 41
Persistent link: https://www.econbiz.de/10014234865
Persistent link: https://www.econbiz.de/10011697092
Persistent link: https://www.econbiz.de/10011820837
Persistent link: https://www.econbiz.de/10011948383
Persistent link: https://www.econbiz.de/10001497145
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244
A single-machine multiproduct manufacturing system with random breakdowns and random repair times is considered. Under a weak capacity condition on the system it is shown that the total work-in-progress (WIP) is a recurrent stochastic process. By replacing the stochastic model by a deterministic...
Persistent link: https://www.econbiz.de/10012746440
In this paper, we consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to non-negativity constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to...
Persistent link: https://www.econbiz.de/10012746441
This note formulates an assignment problem for obtaining optimal level schedules for mixed-model assembly lines in JIT production systems. The problem was formulated as a quadratic integer programming problem in a recent paper by Miltenburg (1989) where, however, only enumerative algorithms and...
Persistent link: https://www.econbiz.de/10012746783
A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number...
Persistent link: https://www.econbiz.de/10012746785