Showing 1 - 10 of 988
Persistent link: https://www.econbiz.de/10003352284
Persistent link: https://www.econbiz.de/10011565488
Persistent link: https://www.econbiz.de/10010493474
Persistent link: https://www.econbiz.de/10003869942
Persistent link: https://www.econbiz.de/10010382874
Persistent link: https://www.econbiz.de/10003860694
Persistent link: https://www.econbiz.de/10009520638
Persistent link: https://www.econbiz.de/10003375593
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011558736
In this paper we consider the following problem: a Company wants to sell consecutive time slots on a single machine. It wants to maximize the revenues, whereby market prizes are not known. Additionally, consider a number of potential buyers of those time slots providing each at least one job....
Persistent link: https://www.econbiz.de/10011558787