Showing 1 - 10 of 225
Persistent link: https://www.econbiz.de/10011801514
Persistent link: https://www.econbiz.de/10011662145
Persistent link: https://www.econbiz.de/10011313075
Persistent link: https://www.econbiz.de/10012265952
Persistent link: https://www.econbiz.de/10011550354
Persistent link: https://www.econbiz.de/10010514418
Persistent link: https://www.econbiz.de/10011293582
Persistent link: https://www.econbiz.de/10011740451
Persistent link: https://www.econbiz.de/10011740467
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.
Persistent link: https://www.econbiz.de/10011808833