Showing 1 - 10 of 10
A mixed-model assembly line enables the joint production of dierent models of a common base product in intermixed model sequence (lot size one). Previous approaches for the short-term planning task of model sequencing either aim at minimizing work overload (mixed-model sequencing and car...
Persistent link: https://www.econbiz.de/10005785951
Assembly line balancing problems (ALBP) arise whenever an assembly line is con- figured, redesigned or adjusted. An ALBP consists of distributing the total workload for manu- facturing any unit of the products to be assembled among the work stations along the line sub- ject to a strict or...
Persistent link: https://www.econbiz.de/10005785956
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so called Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005785957
In many industries mixed-model assembly systems are increasingly supplied out of third-party consignment stock. This novel trend gives rise to a new short-term sequencing problem which decides on the succession of models launched down the line and aims at minimizing the cost of in-process...
Persistent link: https://www.econbiz.de/10005785970
Production processes in a wide range of industries rely on modern mixed-model assembly systems, which allow an efficient manufacture of various models of a common base product on the same assembly line. In order to facilitate a just-in-time supply of materials, the literature proposes various...
Persistent link: https://www.econbiz.de/10005785973
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries. Usually, it is assumed that the production...
Persistent link: https://www.econbiz.de/10005785974
In a mixed-model assembly line dierent models of a common base product can be manufactured in intermixed production sequences. A famous solution approach for the resulting short-term sequencing problem is the so called level scheduling problem, which aims at evenly smoothing the material...
Persistent link: https://www.econbiz.de/10005835230
The sequence-dependent assembly line balancing problem Abstract Assembly line balancing problems (ALBP) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing any unit of the products to be assembled among the...
Persistent link: https://www.econbiz.de/10005739726
Manufacturers in a wide range of industries nowadays face the challenge of providing a rich product variety at a very low cost. This typically requires the implementation of cost efficient, flexible production systems. Often, so called mixed-model assembly lines are employed, where setup...
Persistent link: https://www.econbiz.de/10005616498
The mixed-model sequencing problem is to sequence different product models launched down an assembly line, so that work overload at the stations induced by direct succession of multiple labour-intensive models is avoided. As a concept of clearing overload situations, especially applied by...
Persistent link: https://www.econbiz.de/10008568613