Showing 1 - 10 of 15
Persistent link: https://www.econbiz.de/10000323886
Persistent link: https://www.econbiz.de/10003898868
Persistent link: https://www.econbiz.de/10003600517
Persistent link: https://www.econbiz.de/10011538586
Persistent link: https://www.econbiz.de/10000907918
Persistent link: https://www.econbiz.de/10000909451
Persistent link: https://www.econbiz.de/10000909452
This paper considers an infinite horizon stochastic production planning problem with the constraint that production rate must be nonnegative. It is shown that an optimal feedback solution exists for the problem. Moreover, this solution is characterized and is then compared with the solution of...
Persistent link: https://www.econbiz.de/10012746449
We develop a general methodology for a partially observed stochastic control problem. The dynamics is governed by a discrete-time Markov process. We describe an application to an inventory system with possibility of shrinkage, and introduce unnormalized conditional probabilities to transform the...
Persistent link: https://www.econbiz.de/10012846553
Information delays exist in an inventory system when it takes time to collect, process, validate, and transmit inventory/demand data. A general framework is developed in this paper to describe information flows in an inventory system with information delays. We characterize the suffcient...
Persistent link: https://www.econbiz.de/10014219970