This paper is concerned with an asymptotic analysis of hierarchical production and setup scheduling in a stochastic manufacturing system consisting of a single failure-prone machine and facing constant demands for a number of products. At any given time the system can only produce one type of...
Persistent link: https://www.econbiz.de/10014046909
In this paper, we treat an optimal control problem of a stochastic two-machine flowshop with machines subject to random breakdown and repair. While the problem is difficult to solve, it can be approximated by a deterministic problem when the rates of machine failure and repair become large....
Persistent link: https://www.econbiz.de/10014046911
We consider an N-machine flowshop with unreliable machines and bounds on work-in-process. Machine capacities and demand processes are finite-state Markov chains. The problem is to choose the rates of production on the machines over time to minimize the expected discounted costs of production and...
Persistent link: https://www.econbiz.de/10014046913
This paper is concerned with the problem of production planning in a stochastic manufacturing system with serial machines that are subject to breakdown and repair. The machine capacities are modeled by a Markov chain. The objective is to choose the input rates at the various machines over time...
Persistent link: https://www.econbiz.de/10014047578
This paper is concerned with the problem of production planning in a stochastic manufacturing system with serial machines that are subject to breakdown and repair. The machine capacities are modeled as Markov chains. Since the number of parts in the internal buffers between any two the problem...
Persistent link: https://www.econbiz.de/10014047579
This paper is concerned with an asymptotic analysis of hierarchical production planning in a stochastic manufacturing system consisting of machines that are subject to breakdown and repair. The system produces a single product whose rate of demand over time is constant. The problem is formulated...
Persistent link: https://www.econbiz.de/10014047633
We consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to nonnegativity and upper bound constraints on work-in-process. The objective is to choose machine production rates over time to minimize the long-run average...
Persistent link: https://www.econbiz.de/10014218557
We consider a production planning problem for a general jobshop producing a number of products and subject to breakdown and repair of machines. The machine capacities are modeled as Markov chains. The objective is to choose the rates of production of the final products and intermediate parts on...
Persistent link: https://www.econbiz.de/10014098593
We consider a production planning problem for a dynamic jobshop producing a number of products and subject to breakdown and repair of machines. The machine capacities are assumed to be finite state Markov chains. As the rates of change of the machine states approach infinity, an asymptotic...
Persistent link: https://www.econbiz.de/10012772135
This paper presents an asymptotic analysis of stochastic manufacturing systems consisting of machines in tandem subject to breakdown and repair and facing a constant demand, as the rates of change of the machine states approach infinity. This situation gives rise to a limiting problem in which...
Persistent link: https://www.econbiz.de/10012772136