Showing 1 - 10 of 3,488
We consider a two-stage serial supply chain with capacity limits, where each installation is operated by managers attempting to minimize their own costs. A multiple-period model is necessitated by the multiple stages, capacity limits, stochastic demand, and the explicit consideration of...
Persistent link: https://www.econbiz.de/10014040384
Persistent link: https://www.econbiz.de/10011341811
Persistent link: https://www.econbiz.de/10010227478
Persistent link: https://www.econbiz.de/10010243255
Persistent link: https://www.econbiz.de/10010385195
Persistent link: https://www.econbiz.de/10011484030
Persistent link: https://www.econbiz.de/10011491404
Persistent link: https://www.econbiz.de/10010479233
Persistent link: https://www.econbiz.de/10010409792
Persistent link: https://www.econbiz.de/10010409905