Showing 1 - 10 of 26
We provide a general framework in which to determine the optimal penalty fee inducing the contractor to respect the contracted delivery date in public procurement contracts (PPCs). We do this by developing a real option model that enables us to investigate the contractor's value of investment...
Persistent link: https://www.econbiz.de/10008823913
We provide a general framework in which to determine the optimal penalty fee inducing the contractor to respect the contracted delivery date in public procurement contracts (PPCs). We do this by developing a real option model that enables us to investigate the contractor's value of investment...
Persistent link: https://www.econbiz.de/10013155078
This paper provides a general framework to determine the optimal penalty fee to induce a contractor to respect the contracted delivery date in public procurement contracts (PPCs). We did this by i) developing a real option model to evaluate the investment timing flexibility that the inclusion of...
Persistent link: https://www.econbiz.de/10013155956
Persistent link: https://www.econbiz.de/10003808074
Evidence from ongoing procurement and concession contracts shows that time overruns are widespread. Two key elements, among others, can affect the delays in the execution of the contracts: a) uncertainty over production costs; b) inefficiency in the judicial system. In this article we summarize...
Persistent link: https://www.econbiz.de/10013057144
When assigning a concession contract, the regulator faces the issue of setting the concession length. Another key issue is whether or not the concessionare should be allowed to set the timing of new investments. In this paper we investigate the impact of concession length and investment timing...
Persistent link: https://www.econbiz.de/10014066566
Persistent link: https://www.econbiz.de/10000889862
Persistent link: https://www.econbiz.de/10001178006
Persistent link: https://www.econbiz.de/10003741997
Persistent link: https://www.econbiz.de/10003785774