Showing 1 - 10 of 31
The EOQ repair and waste disposal problem was studied first by Richter, 1997. A first shop is providing a homogeneous product used by a second shop at a constant demand rate. The first shop is manufacturing new products and it is also repairing products used by a second shop, which are then...
Persistent link: https://www.econbiz.de/10011378468
This paper considers the general production and recovery EOQ model (GPRM), which generalizes the model of Saadany and Jaber (2008). In this general model, one supplier and one or several buyers constitute the underlying supply chain. The supplier is supposed to manufacture new products, which...
Persistent link: https://www.econbiz.de/10011411645
Persistent link: https://www.econbiz.de/10010386743
Persistent link: https://www.econbiz.de/10009313424
An economic lot size problem is studied in which a single vendor supplies a single purchaser with a homogeneous product and takes a certain fraction of the used items back for remanufacturing, in exchange for a deposit transferred to the purchaser. For the given demand, productivity, fixed...
Persistent link: https://www.econbiz.de/10009236818
Persistent link: https://www.econbiz.de/10001220551
Persistent link: https://www.econbiz.de/10000983899
Persistent link: https://www.econbiz.de/10003717185
Persistent link: https://www.econbiz.de/10003280596
Persistent link: https://www.econbiz.de/10003859639