Showing 1 - 10 of 31
We investigate for 26 OECD economies if their current account imbalances are driven by stochastic trends. Standard ADF results are contrasted with tests accounting for the bounded support of the current account. Neglecting the latter feature might give misleading results in the sense that ADF...
Persistent link: https://www.econbiz.de/10003334824
Persistent link: https://www.econbiz.de/10003701470
Persistent link: https://www.econbiz.de/10010256162
We investigate for 26 OECD economies whether their current account imbalances to GDP are driven by stochastic trends. Regarding bounded stationarity as the more natural counterpart of sustainability, results from Phillips-Perron tests for unit root and bounded unit root processes are contrasted....
Persistent link: https://www.econbiz.de/10014201022
Persistent link: https://www.econbiz.de/10003893874
Persistent link: https://www.econbiz.de/10003894166
Unit root tests are considered for time series with innovational outliers. The function representing the outliers can have a very general nonlinear form and additional deterministic mean and trend terms are allowed for. Prior to the tests the deterministic parts and other nuisance parameters of...
Persistent link: https://www.econbiz.de/10009616785
Unit root tests for time series with level shifts are considered. The level shift is assumed to occur at a known time point. In contrast to some other proposals the level shift is modeled as part of the intercept term of the stationary component of the data generation process which is separated...
Persistent link: https://www.econbiz.de/10009580481
Tests for unit roots in univariate time series with level shifts are proposed and investigated. The level shift is assumed to occur at a known time. It may be a simple one-time shift which can be captured by a dummy variable or it may have a more general form which can be modeled by some general...
Persistent link: https://www.econbiz.de/10009580487
Unit root tests for time series with level shifts of general form are considered when the timing of the shift is unknown. It is proposed to estimate the nuisance parameters of the data generation process including the shift date in a first step and apply standard unit root tests to the...
Persistent link: https://www.econbiz.de/10009581100