Showing 1 - 10 of 204
Standard methods for estimating production functions in the Olley and Pakes (1996) tradition require assumptions on input choices. We introduce a new method that exploits (increasingly available) data on a firm's expectations of its future output and inputs that allows us to obtain consistent...
Persistent link: https://www.econbiz.de/10014635688
When labour market competition is imperfect, positive industry (and firm) productivity shocks can be passed through to workers in the form of higher wages. We document how the UK auto industry, following a period of decline, experienced a four-decade-long productivity boom. There was a...
Persistent link: https://www.econbiz.de/10014635658
In this paper we specify and use a new duration model to study joint retirement in married couples using the Health and Retirement Study. Whereas conventionally used models cannot account for joint retirement, our model admits joint retirement with positive probability, allows for simultaneity...
Persistent link: https://www.econbiz.de/10009715124
This paper introduces a bivariate version of the generalized accelerated failure time model. It allows for simultaneity in the econometric sense that the two realized outcomes depend structurally on each other. The proposed model also has the feasure that it will generate equal durations with...
Persistent link: https://www.econbiz.de/10010254535
Persistent link: https://www.econbiz.de/10012301823
This paper introduces a bivariate version of the generalized accelerated failure time model. It allows for simultaneity in the econometric sense that the two realized outcomes depend structurally on each other. Another feature of the proposed model is that it will generate equal durations with...
Persistent link: https://www.econbiz.de/10011994688
Persistent link: https://www.econbiz.de/10012301140
Persistent link: https://www.econbiz.de/10000879640
Persistent link: https://www.econbiz.de/10000879715
Persistent link: https://www.econbiz.de/10000673549