Showing 1 - 10 of 95
In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We...
Persistent link: https://www.econbiz.de/10013470830
Linear bilevel optimization problems are often tackled by replacing the linear lower-level problem with its Karush–Kuhn–Tucker conditions. The resulting single-level problem can be solved in a branch-and-bound fashion by branching on the complementarity constraints of the lower-level...
Persistent link: https://www.econbiz.de/10014504266
Persistent link: https://www.econbiz.de/10010531971
Persistent link: https://www.econbiz.de/10011309551
Persistent link: https://www.econbiz.de/10011439325
Persistent link: https://www.econbiz.de/10011441276
Persistent link: https://www.econbiz.de/10011441291
Persistent link: https://www.econbiz.de/10011444331
Persistent link: https://www.econbiz.de/10011444333
Persistent link: https://www.econbiz.de/10011445323